Industrial Engineering & Solutions
Engineering that raises plant productivity and reliability
We assess plant performance, find where output, energy and time are lost, and develop improvements that are technically and commercially viable, from line fixes to expansion studies.
Division scope
Industrial diagnostics
Plant and production-line assessment, equipment effectiveness (OEE), bottleneck analysis and waste identification.
Process and productivity improvement
Throughput, yield, product quality, operating efficiency and continuous improvement.
Reliability engineering
Asset performance, failure analysis, maintenance strategies and reliability indicators.
Energy and resource efficiency
Utility consumption, loss reduction, technical options and economic evaluation.
Plant development
Expansion studies, modernisation, automation opportunities, capacity and capital-project alternatives.
Client value
Higher productivity, lower operating cost, better use of assets and resources, and a clearer basis for investment decisions.
Request a quote for this divisionEngineering tools for this division
Run a calculation or assessment now, then ask the team to take it further.
- OEE & Production Efficiency CalculatorCalculate OEE for a production line: split Overall Equipment Effectiveness into availability, performance and quality, and find the largest loss.Open the tool
- Equipment Downtime Cost CalculatorCalculate the cost of equipment downtime from lost production contribution, repairs, labour and scrap, annualised, for plant and maintenance managers.Open the tool
- Industrial Energy Savings CalculatorEstimate annual electricity cost savings, net savings and simple payback for industrial facilities from a planned reduction in consumption.Open the tool
Scope in detail
From indicators to an opportunity register
An assignment starts with production, quality, downtime, energy and maintenance indicators, then site observations and interviews with operators to find where losses concentrate.
Findings become an opportunity register prioritised by impact, feasibility, investment and risk. Technical and financial assumptions are validated before an opportunity becomes a project.
Tracing losses through the process
We examine material, energy and time losses through the process: line constraints, yield reduction, recurrent defects and quality variability.
Interventions may include changed operating conditions, equipment upgrades, better material flow or improved measurement and control, each assessed for practicality and economic merit.
Failure history and maintenance strategy
Analysis of recurring failures and their consequences, review of preventive, predictive and corrective strategies, and indicators such as availability, downtime and MTBF where quality data exists.
Savings that can be verified
Reviews may cover pumping, compressed air, cooling, thermal systems and utilities. Recommendations are judged on verifiable savings, capital and operating cost, and effects on quality, safety and continuity.
Rehabilitate, or add capacity
Current and future capacity, equipment and utility requirements, layout and interfaces with existing assets, weighing rehabilitation against new capacity to define a scope that can be tendered and built.
Request a quote for this division
Describe what you need. An engineer for that scope will contact you with the next step.
Or build your request step by step